1. Spatial Scope

The proposed site for the Beighton extreme sport park is located on the A57 which is the road connecting Sheffield city centre to junction 31 on the M1. Some of the local residential areas that surround the site include: Woodhouse, Hackenthorpe and Crystal Peaks, all of which could make up some for some of the workforce.

Other local places of interest which could have an impact on the site include: the Shirebrook Nature Reserve, Westfield Sports Centre and Crystal Peaks shopping centre to the south. This can be seen more clearly in figure 1 and 2 below. The plot of land is currently owned by the Sheffield City Council and the developers are LBX Holdings Ltd who is based in Newcastle.

1.1 Transport Links

As I mentioned before the site is located near the M1, which is the main motorway linking the south of Britain to the north. There is a tramline that runs from Sheffield city centre to Crystal Peaks one of the neighbouring residential areas and a bit further afield on the other side of the A57 there is Woodhouse railway station which again runs into the Sheffield city centre. The site would also be easily accessible for people living in the local areas that surround the proposed site. This can be viewed better in figure 1 and 2 below.

1.2 Employment

The project information (2011) states that 140 full time jobs will be necessary during a 25 year operation period. More on employment will be discussed in section 3.

This image is courtesy of www.MapQuest.com (2003) site accessed on (2011) from google images

Figure 1. This map shows the proposed site for the sports park which is highlighted in blue. As you can see it is located directly on the A57 and is very close to residential areas. The M1 is located just off to the right of the picture.

(Law) Motivation and managing diversity – Second Draft

Photo courtesy of Stephen Jay (2011)

Figure 2. This is an aerial photograph of the site which is circled in orange, again showing the A57 on the left and some of the residential areas surrounding the site.

2. Life-cycle of activities and Physical Presence

2.1 Materials

Where possible materials will be used from local areas for the six major constructions in the proposed area. The access for the lorries bringing the materials should be fairly easy due to the M1 and A57 being so close. Particularly for the snowdome, skate park and canoe area, specialised materials will needed to be brought in to make them successful. Basic construction materials will be needed for the administration building and hotel such as; steel, timber and glass and tarmac would also be needed for the car park. The project information hand out (2011) also states that 10,000 tonnes of topsoil will also be needed for landscaping.

2.2 Temporal Scope

According to the project information hand out (2011) the site will give 100 jobs for a 16 month construction phase with over 200,000 tonnes of materials being needed to complete the park. The hand out also states that these materials will be transported in 10,000 trips over a six month period assuming it is done in a six day week.

2.3 Dimensions

The dimensions, materials and layout in section 2.3 of each building are given in the Beighton Extreme Sports Park project information handbook (2011)

Snowdome – This building would be the largest, www.SkyscraperPage.com (2011) state that the square footage of the Xscape in Milton Keynes is 55,000m2 with a 44m roof. Beighton snowdome will be a lot smaller compared to this with only a small selection of restaurants so the dimensions will total 5,000m2 with a height of just 30m.
Skate Park – This is an outdoor activity and will be 450m2; the height will be around 8m. A few bars will surround the skate park too adding to the area slightly.
Canoe Park – www.london2012.com (2011) states that their canoe run in Lee Valley is 300m long, again Beighton has a smaller area so the canoe run will only be 200m in length, with picnic areas surrounding the run and some restaurants.
Coach and Car Parking – Because this is a unique project and its easy accessibility the car park will be around 18,720m2 and floodlight. This includes all the circulation, floodlighting and bay parking areas. In total there will be enough bays for 590 cars 45 of which are for disabled drivers and in addition to this 120 spaces for overspill, plus 10 spaces for coaches.
Hotel – The hotel will be two floors and have a square footage of 3700m2, it will include the usual hotel amenities such as bar and two restaurants, there will also be 20 rooms on the ground floor and a further 80 on the second floor.
Administration Building – This will be 180m2 and will be built out of the same materials as the hotel which is timer steel and reinforced concrete.

Photo courtesy of Stephen Jay (2011)

Figure 3. This is another aerial photograph giving more detail into where the proposed buildings will be constructed.

3. Assessment of Environmental and Socio – Economic Effects/ Reasons for Scoping Report

3.1 Flora and Fauna

Currently the site is attempting to replant some trees and other smaller plants as shown in figure 4 below, this would ultimately be disrupted by the project. However new shrubs and trees would be planted if the site were constructed and many of the areas round the hotel, admin building and canoe run could retain the local flora and fauna.

Figure 4 shows some areas of Beighton Tip that has tried to be rehabilitated with trees and plants, some of this may be lost due to the construction plans.

3.2 Air and Noise Quality

The Park will undoubtedly increase traffic in the local area which in turn will increase noise and air pollution, this will partly be due to the proximity of the M1.

You read “A scoping report on the Beighton Extreme Sport Park proposal” in category “Essay examples

In popular seasons such as the summer months And weekends the car park may reach its maximum capacity leading to some overspill into the local residential areas, which again would increase noise and air pollution. Because canoeing and skiing are very specialist sports and the site is not a natural habitat for either of these sports, a lot of energy will be used to pump water into the canoe run and ski slope for freezing, this process will lead to a decrease in air quality and may add to problems on a global scale.

3.3 Groundwater Problems

The project handbook (2011) states that 1 tonne of snow per day will be used and that inside the snow dome the temperature will be kept at around -2 C .In order for the snow to be produced 1500litres of water will be used per day with an underground tank storing 20,000litres. This could lead to some groundwater problems on the site if the tank were to break and lose water.

3.4 Light Pollution

Because the park will be open well into the night, it may cause problems for the local residential areas in terms of constant light during late hours. With the lights from the M25 so close by, the park may add significant light pollution to the local area. A strategic environmental assessment of Devon transport links (pp37:2006) identified some of the main problems linked with light pollution:

Light trespass: the intrusion of light into homes
Glare: unshielded bright lighting may be hazardous in a relatively small area
Sky Glow: the broad orange glow that prevents appreciation of the night sky

They discovered that these types of light pollution led to a loss of insects such as moths, disrupted bird migration patterns and even stunted tree and shrub growth.

3.5 Sewage, Waste and Litter

Currently there is a river running through the site which for the most part is underground. This is already has been polluted which is clear from the reddish colour which is most probably iron oxides and large amount of litter, figure 5a and b highlights this ; the construction of the site will only increase the amount of sewage in the area which could cause some problems. There is water quality testing points all over the site which are clearly visible in figure 6. Before any work can take place a lot of the rubbish and graffiti will need to be cleaned not just in the site but on some of the walkways leading to the proposed area, this is shown in figures 7 and 8. Recycling points and rubbish bins will be put in place all over the proposed site so as to limit the amount of litter when the project has been constructed. Hopefully the extreme sports park will deter vandalism and litter in the local residential areas.

Figure 5a & b indicates the iron oxides (on the left) and possible other pollutants that inhibit the local stream that runs through the site